Design & Build

Engineering

Jonathan Bourque
Engineering Manager
C: 337.552.6527
E: jbourque@reaganpower.com

Did You Know?

Reagan supplied the first Waukesha P9394GSI driven Natural Gas Compressor Package offshore in the Gulf of Mexico.


Reagan supplied the first Caterpillar Electric Motor Driven Natural Gas Compressor Package in the U.S.

Quality is no accident. We build-it-in.

Beginning with customer specifications and requirements – we engineer, design, fabricate components and package in-house – assuming total undivided responsibility for customer satisfaction.

Situated on 9 acres, three shops totaling more than 61,000 square feet make up our Broussard, LA production facility. Shop #1 is dedicated to Piping, Vessels and Skid Welding.  Shop #2 is the engine and compressor overhaul facility as well as the parts warehouse while Shop #3, with its 160 tons of overhead lifting capacity, is where final assembly and completion take place.

Labor and production inventories are managed for optimum efficiencies and on time deliveries.

Piping, Vessel and Skid Welding Facility:

  • 18,000 sq. ft
  • Eight (8) bays
  • Two (2) 40-ton Double-Hoist Overhead Cranes
  • Two (2) 15-ton Single-Hoist Overhead Cranes
  • 36’-0” Hook Height

Overhaul Facility:

  • 13,000 sq. ft.
  • Eight (8) Bays
  • One (1) 30-ton Double-Hoist Overhead Crane
  • One (1) 15-ton Single-Hoist Overhead Crane
  • 36’-0” Hook Height

 Package Assembly Facility:

  • 30,000 sq. ft.
  • Twelve (12) Bays
  • Four (4) 40-ton Double-Hoist Overhead Cranes
  • 38’-0” Hook Height